UNIVERSITY OF LOUISVILLE | BELKNAP HALL

PROJECT FACTS
2022 Best Multi-Family ICF Award
ICF Use: 65,552 sq ft
ICF Installation Time: 140 days
LEED Gold Certified
A new $35.0 M, 5-story, 130,000 sq ft, 452-bed residence hall and attached Cultural & Equity Centers comprised of 8” cast-in-place Insulated Concrete Form (ICF) exterior bearing walls with a single structural steel interior beam/column line located within an 8” cold-formed metal framing corridor wall. The floor system consists of 8” hollow-core precast concrete planks with a 3” concrete topping. Foundations consist of concrete grade beams framing between concrete drilled piers bearing on bedrock. The use ICF construction on this project contributed toward a more energy-efficient, sustainable, and economical building design. Belknap Hall is located in the heart of the Belknap campus directly adjacent to the Student Activities Center.
ADDITIONAL PROJECT PHOTOS