KENTUCKY STATE CAPITOL EXTERIOR RENOVATIONS
PROJECT FACTS
Dome Renovation
​
Reroof
​
Window Replacement
This project, currently under development, is for maintenance for three distinct portions of the building (plus some window replacement at the nearby governor’s mansion): Capitol Dome, Roof Maintenance and Masonry Parapets, and Window Restoration. The initial study and survey just completed has uncovered numerous systems with failures or in need of near complete replacement.
Structural work is to include reconstruction of the lantern and its inner frame; framing corrosion mitigation; access stair reconstruction; and stone,
concrete and masonry repairs. Deterioration/fracture of anchors at the base of the dome’s tension ring and cracking of the entablature distribution ring are requiring careful investigation and finite element and truss analysis of the complex load distributions to ensure adequacy and to make for appropriate repairs. There are also multiple phases of investigation with vertical access, LIDAR scanning, and selective demolition to account for existing construction techniques as much of the structure is undocumented.
ADDITIONAL PROJECT PHOTOS