CENTRAL KENTUCKY BLOOD CENTER
PROJECT FACTS
​
The $6.0 M project, located in Beaumont Centre on the southwest side of Lexington, consists of two floors of approximately 17,000 sq ft each above grade over a 6,000 sq ft basement and a 5,000 sq ft crawl space for lab piping access. It is a steel frame structure utilizing steel joists for the roof and composite steel beam construction for the first and second floors.
​
The lateral load resisting system for the building utilizes moment resisting frames at the perimeter. The foundation system consists of concrete spread footings which bear on soil.